Planned maintenance · Leeds & Yorkshire

Planned preventative maintenance in Leeds on a written schedule

Planned preventative maintenance puts the upkeep of a building into a written annual schedule, so that checks happen on set dates instead of after something fails. AD Facilities Management runs PPM schedules for the building fabric, fixtures and grounds of commercial premises in Leeds and across Yorkshire.

Planned Maintenance: callback

Leave a name and number and we call you back.

We only use this to call you back.

Planned Maintenance in Leeds and across Yorkshire

Most building defects start small. A gutter blocks with leaves and the water runs down the wall. A door closer loses its adjustment and the door begins to slam. A pothole in the car park gets a little deeper each winter. Planned maintenance is the habit of looking at these things on a fixed cycle and putting them right while the job is still minor. The schedule says what is checked, how often, and in which month.

Our PPM covers the fabric of the building, the fixtures inside it and the grounds around it. Typical items are gutters and downpipes cleared, doors and closers checked, floor finishes inspected, decoration cycles planned, car park lining and surfaces reviewed, fencing and signage checked, and seasonal tasks such as leaf clearance and gritting preparation. Each item has a frequency and a month against it. Anything found that needs a repair is reported with a photo and a recommendation.

Statutory testing is a separate matter and we are clear about it. Fire alarm tests, emergency lighting tests, gas safety checks, electrical inspection and water hygiene are carried out by your own specialist contractors. AD Facilities Management does not perform them. What we can do is log their due dates in the same schedule, so the person responsible for the building sees the fabric tasks and the compliance dates together in one document.

When a building needs a PPM schedule

  • Repairs are only ever raised after a tenant or member of staff complains.
  • Nobody can say when the gutters were last cleared or the doors last checked.
  • The same defects come back each winter and are patched each time.
  • Maintenance spending arrives in unplanned lumps that are hard to budget for.
  • A lease or a service charge budget calls for the building to be kept in repair.
  • Several contractors visit the site and no single document shows who does what and when.
Recognise any of these?Book a site visit and get the scope for planned maintenance in writing.
Request a callbackContact us

What is included

Gutters and downpipes

Gutters, hoppers and downpipes within safe reach are cleared and checked for leaks, loose brackets and blockages at set points in the year.

Doors and closers

External and internal doors, closers, hinges, locks and seals are inspected and adjusted so that they shut and secure correctly.

Floor finishes and decoration

Carpets, vinyl, entrance matting and painted surfaces are reviewed on a cycle, with redecoration planned by area.

Car parks and surfaces

Line markings, potholes, kerbs, drainage gullies and paving are checked and any trip hazards are recorded.

Fencing, gates and signage

Boundary fencing, gates, bollards and site signs are inspected for damage, loose fixings and faded or missing information.

Seasonal tasks

Leaf clearance, moss treatment, winter preparation and spring tidy-up work are written into the months where they belong.

How it runs

1. Walk the building

We survey the premises with you and list the elements that need regular attention, along with their present condition, any access limits and the working hours of the people using the site.

2. Write the schedule

Each task is given a frequency and a month in a written annual schedule. Your specialist contractors’ statutory test dates can be logged alongside, marked clearly as theirs to carry out.

3. Carry out the visits

Visits take place in the months set out. The tasks due are completed, conditions are noted and any defect that cannot be dealt with during the visit is photographed for a decision.

4. Report and review

After each visit you get a short report with photos. The schedule is reviewed with you once a year and adjusted where a task needs doing more or less often.

Why use AD Facilities Management for planned maintenance

  • You deal with one person who knows the schedule and the building.
  • Every task, frequency and month is written down before the first visit takes place.
  • Visit reports include photos taken before and after the work, filed against the task in the schedule.
  • Cleaning, window cleaning, grounds work and repairs can sit in the same plan under one contractor.
  • We do not carry out statutory testing or engineering work, and the schedule says so in plain words.

Who it is for

We provide planned maintenance for offices, schools, retail, industrial and warehouses, block management and landlords, healthcare.

Areas covered

Leeds is the base and the work extends across Yorkshire. The main area pages are Leeds, Leeds City Centre, Holbeck, Hunslet, Thorpe Park, Morley, Pudsey, Horsforth, Bradford, Wakefield, Huddersfield, Halifax, Harrogate, York, Sheffield, Hull. Every other town is on the coverage finder.

Planned Maintenance: common questions

  • With AD Facilities Management it covers scheduled inspections and upkeep of the building fabric, fixtures and grounds. Examples are gutter clearing, door and closer checks, floor and decoration reviews, car park surfaces and lining, fencing, signage and seasonal tasks. It does not include mechanical, electrical or gas servicing.
  • No. Statutory testing such as fire alarms, emergency lighting, gas, electrical inspection and water hygiene is done by your specialist contractors. We do not perform those tests. If it helps, we can record their due dates in the PPM schedule so that one document shows everything planned for the building.
  • It starts with a site walk to list what needs regular attention. We then draft a written annual schedule showing each task, its frequency and the month it falls in. You review the draft, we adjust it, and the visits begin once the final version has been agreed in writing.
  • Minor items that fall within the visit, such as adjusting a closer or refixing a sign, are dealt with there and then. Anything larger is photographed and reported with a recommendation. You decide whether it goes ahead as a separate repair, and nothing extra is done without your approval.
  • Yes. A managing agent or landlord with several buildings can have a schedule for each property in the same format, with visits grouped sensibly by location. Reports are issued per building so that the records for each one stay separate and easy to pass on.
Often taken together

Services that sit well alongside this one.

Want upkeep on a schedule?

Tell us about the building and we will arrange a site walk to draft a written PPM schedule.

Hours[HOURS]
Call
[PHONE]
Site
Visit